First Niger Bridge shut for emergency repairs

Nairavoice | 2h ago 237 0 1 min read
First Niger Bridge shut for emergency repairs

The Federal Ministry of Works has fully shut the First Niger Bridge in Onitsha, Anambra State, for emergency maintenance and rehabilitation.

The ministry closed the bridge on Monday September 7, 2026. The rehabilitation work is expected to last until September 21.

According to the ministry, the intervention became necessary because of the deteriorated condition of the bridge’s carriageway and damage to some components caused by vandalism, including parts of the expansion-joint steelwork and stanchion and steel-truss nuts and bolts.

It added that the works will include the removal of the deteriorated asphalt surface and laying of a new approximately 40mm asphalt wearing course, alongside other maintenance and safety works.

The ministry further revealed that the Federal Government will also install solar-powered streetlights and CCTV cameras as part of measures to improve safety and deter vandalism.

It directed motorists to use the Second Niger Bridge through Obosi towards Asaba, Delta State, during the closure.

Enjoying this article? Support our work with a small crypto donation.

It stated that traffic diversion arrangements, road signs, safety barriers and traffic-control personnel would be deployed to minimise disruption and protect road users and construction workers.

Show Some Love By Sharing

Discover more from NAIRAVOICE.COM.NG

Subscribe to get the latest posts sent to your email.

Enjoyed this? A small crypto donation helps us keep publishing.
Nairavoice
Nairavoice

Contributor at NairaVoice.com.ng

Related Posts

Leave a Reply